Projects & case studies

Commercial, institutional and remote projects across WA.

From shire aquatic centres to school campuses and commercial battery systems, our work is measured by reliability, cost savings and minimal disruption to the people who use the site.

Case studies

Selected projects

Shire of Perenjori

Perenjori Aquatic Centre

Motor and pump control on the aquatic centre plant to cut power use without reducing water turnover. Savings were independently reported by Nilsen Engineers and tracked across two seasons.

Shire of Morawa

Morawa Swimming Pool

Pump energy reduction for a regional council pool, with power savings documented in an independent engineering report and endorsed by the pool manager.

St Mary's Anglican Girls' School

Campus energy reduction

Works scheduled around the school timetable with no disruption to students or staff. The school’s grounds team has offered to act as a referee for similar projects.

Commercial client

Battery energy storage system

A commercial LFP battery installation integrated with existing solar and switchboard infrastructure to shift solar into the evening peak and provide backup supply.

Remote & hybrid sites

Ground-mounted solar arrays

Large ground-mounted arrays designed to work alongside existing generation, reducing diesel run hours at sites where fuel logistics are costly.

Commercial & hospitality

Inverter and battery integration

Hybrid inverter and battery systems installed in plant rooms with clean cable management, protection and monitoring for long-term reliability.

Project types

Where our integrated systems make the biggest difference

Resorts

Large battery systems and hybrid HVAC that keep guest comfort high while cutting energy and generator costs.

Airports & remote facilities

Off-grid and hybrid solutions where reliability is critical and grid supply is limited or absent.

Shire facilities

Recycling centres, leisure centres and aquatic facilities with heavy pump, HVAC and plant loads.

Schools & heritage sites

Classroom HVAC, solar and storage delivered out of hours, with care for heritage buildings.

Commercial & industrial

Workshops and industrial sites with motor loads, demand charges and long operating hours.

Critical infrastructure

Battery-backed supply for loads that must stay on during outages and grid events.

Independent reports

Measured results, not marketing claims

Several of our efficiency projects were assessed by independent engineers. You can read the reports below.

Perenjori Aquatic Centre: energy saving report

Nilsen Engineers

Perenjori Aquatic Centre: power saving 2021

Season results

Morawa Swimming Pool: energy saving report

Nilsen Engineers

Morawa pool manager testimonial

Shire of Morawa

Hollywood Primary: power saving report

Education

St Mary's Anglican Girls' School: client letter

Education

Free energy review

Have a site like these?

Tell us about your facility and we will show you how similar projects have performed and what an integrated system could deliver for you.