Projects & case studies
From shire aquatic centres to school campuses and commercial battery systems, our work is measured by reliability, cost savings and minimal disruption to the people who use the site.
Case studies
Shire of Perenjori
Motor and pump control on the aquatic centre plant to cut power use without reducing water turnover. Savings were independently reported by Nilsen Engineers and tracked across two seasons.
Shire of Morawa
Pump energy reduction for a regional council pool, with power savings documented in an independent engineering report and endorsed by the pool manager.
St Mary's Anglican Girls' School
Works scheduled around the school timetable with no disruption to students or staff. The school’s grounds team has offered to act as a referee for similar projects.
Commercial client
A commercial LFP battery installation integrated with existing solar and switchboard infrastructure to shift solar into the evening peak and provide backup supply.
Remote & hybrid sites
Large ground-mounted arrays designed to work alongside existing generation, reducing diesel run hours at sites where fuel logistics are costly.
Commercial & hospitality
Hybrid inverter and battery systems installed in plant rooms with clean cable management, protection and monitoring for long-term reliability.
Project types
Large battery systems and hybrid HVAC that keep guest comfort high while cutting energy and generator costs.
Off-grid and hybrid solutions where reliability is critical and grid supply is limited or absent.
Recycling centres, leisure centres and aquatic facilities with heavy pump, HVAC and plant loads.
Classroom HVAC, solar and storage delivered out of hours, with care for heritage buildings.
Workshops and industrial sites with motor loads, demand charges and long operating hours.
Battery-backed supply for loads that must stay on during outages and grid events.
Independent reports
Several of our efficiency projects were assessed by independent engineers. You can read the reports below.
Free energy review
Tell us about your facility and we will show you how similar projects have performed and what an integrated system could deliver for you.